Tel:0161 612 6893   -   Fax:0161 285 1503   -   Email:info@glassblocks.co.uk
 
Installation Guide

Golden Rules:

  • Precast Easifix glass block panels are not load bearing.
  • For best integral strength, always install into a four sided opening.

Step 1 : Position and screw in place first part of aluminium channel. Ensure that the screws are located to the relevant marker.

Step 2 : Vertically lift the first panel having placed plastic packers on base of aluminium (a) and slide into position. Temporarily secure in place using restraint anchors (b) supplied.

Step 3 : Apply silicone to the connecting joint on the second panel (c). Carefully lift second panel in vertical motion onto plastic packers and slide up to first panel ensuring a neat joint at intersecting point. Note : Apply more silicone if required.

Step 4 : Position second piece of channel and screw bolts into predrilled holes. Note : Fit sides first, then top piece, then bottom. If the Precast Easifix is a vertically or horizontally connecting panel, grout the connecting joint, both sides with the grout supplied.

Step 5 : If using plasterboard coverstrip carefully measure, mitre corners and slot into position.

Step 6 : Position plasterboard behind cover strip.

PRECAST SYSTEMSPrecast Easifix Wall PanelsChannel FinishesCharacteristics of Precast EasifixInstallation GuideMoviesPrecast Concrete Wall PanelsPrecast Floor Panels
www.glassblocks.co.uk - 170 Lodge Lane - Hyde - Cheshire - SK14 4LB - Access our old site