INDEPENDENCE REGARDING MAIN WORKS

Paver panels ought to be independent in relation with main works to allow them to cope with expansion and contraction.

Provide for expansion and contraction :

  • on piers with 2 coats of emulsion or 8mm bitumen expansion foam. Around the perimeter border 10mm expansion foam should be incorporated, then weatherproofed by caulking with silicon.
  • Note : Expansion joints must not be bridged.

RECOMMENDATIONS FOR IMPLEMENTATION

The minimum slope is 2-3% to allow for water escape. Always provide for a good ventilation of the underside of the paver panels. Floor panel being craned into position.

 1. Lifting ring  2. Lifting sockets                                      Panel showing location of lifting socket

 

PRECAST SYSTEMSPrecast Easifix Wall PanelsPrecast Concrete Wall PanelsPrecast Floor PanelsCharateristics of Floor BlocksPrecast Floor PanelsCharacteristics of Precast Floor PanelsFloor Panel SpecificationFixing PrinciplesInstallation
www.glassblocks.co.uk - 170 Lodge Lane - Hyde - Cheshire - SK14 4LB - Access our old site